NotesFAQContact Us
Collection
Advanced
Search Tips
Showing all 4 results Save | Export
Kliment, Stephen A.; Smith, Jack W. – American School Board Journal, 1971
Describes fast-track, a method for saving time and construction costs by phased or overlapping construction--e.g., constructing such elements as the foundation before the rest of the building has been completely designed. (JF)
Descriptors: Architectural Programing, Building Systems, Construction Costs, Educational Facilities Design
Luckman, James M. – AIA Journal, 1972
Descriptors: Architectural Programing, Architectural Research, Building Systems, College Housing
Flansburgh, Earl R. – Architectural Record, 1975
An architect tells how cost monitoring affects the design and building process. Following are case histories of eight schools shown chronologically to reflect the growing design sophistication of his firm. (Available from 1221 Avenue of the Americas, New York, NY 10020, $15.00 annually.) (Author/MLF)
Descriptors: Architectural Programing, Bids, Building Systems, Construction Costs
Baas, Alan M. – 1973
Replacing the general contractor with a "construction manager" directly accountable to the owner promises greatly improved control over cost and scheduling economies. The construction manager should have special skills in construction, cost analysis, critical path method scheduling, and be familiar with the qualifications of local subcontractors.…
Descriptors: Architectural Programing, Building Systems, Construction Costs, Construction Management