NotesFAQContact Us
Collection
Advanced
Search Tips
Showing 1 to 15 of 17 results Save | Export
Hentschke, Guilbert C.; Shaughnessy, John – IAR Research Bulletin, 1973
Discusses steps three and four in a budgeting process that uses Program Evaluation and Review Techniques (PERT). Step three involves developing time estimates and scheduling each of the activities in the PERT chart. Step four involves responsibility identification and coordination. (Author/JF)
Descriptors: Budgeting, Critical Path Method, Guidelines, Networks
Fuerst, Hans – Ind Training Int, 1970
Discusses the development of critical path networks and their benefits when used in the training and manpower development field. (EB)
Descriptors: Critical Path Method, Job Analysis, Management Development, Models
Anderson, Gene M. – College and University Business, 1973
A system of network scheduling develops successful fund-raising models. (Editor)
Descriptors: Critical Path Method, Financial Support, Higher Education, Institutional Administration
Del Rio, Juan Jose Trujillo; And Others – J Chem Educ, 1970
Describes a procedure employing network analysis for designing an undergraduate program in chemistry, mathematics and physics in a Mexican university. Advantages and disadvantages of the method are discussed. Illustrative tables and diagrams are presented. Bibliography. (LC)
Descriptors: Chemistry, College Science, Critical Path Method, Curriculum Design
Blankenbaker, E. Keith – Man/Society/Technology--A Journal of Industrial Arts Education, 1971
Descriptors: Construction (Process), Critical Path Method, Flow Charts, Industrial Arts
Platts, C. V.; Wyant, T. G. – Educ Rev, 1969
Descriptors: Critical Path Method, Educational Administration, Educational Planning, Educational Research
COOK, DESMOND L. – 1966
THIS PAPER DISCUSSES THE CONCEPTS OF EDUCATIONAL PLANNING, THE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT), AND THE POTENTIAL VALUE THAT PERT HAS FOR EDUCATIONAL PLANNING. THE DISCUSSION OF PLANNING IS LIMITED TO SHORT-RUN EDUCATIONAL PROJECTS. THE NATURE OF PERT IS DISCUSSED AND ITS APPLICABILITY TO PLANNING IS ESTABLISHED. SEVERAL BENEFITS…
Descriptors: Administrator Role, Critical Path Method, Decision Making, Educational Planning
LIEBESKIND, MORRIS – 1965
PROBLEMS IN THE SCHEDULING AND COMPLETION OF SCHOOL BUILDING DESIGN AND CONSTRUCTION PROJECTS ARE DISCUSSED WITH REFERENCE TO THE CRITICAL PATH METHOD OF PROGRAMING. THE DISCUSSION GIVES A BROAD OVERVIEW OF THE METHOD WITH DETAILED SUGGESTIONS FOR SCHOOL ADMINISTRATORS. SPECIFIC SUBJECT AREAS INCLUDE--(1) CPM, A NEW MANAGEMENT TOOL, (2) CPM…
Descriptors: Building Design, Computers, Critical Path Method, Information Processing
Tucciarone, John P. – 1977
As part of an introductory computer programming course, students were assigned seven programs selected to expose them to the varied applications of BASIC. Three additional programs were selected by the students themselves from other courses or from topics in the text which had not been covered in class. The topic which seemed to arouse the…
Descriptors: Algorithms, Computer Programs, Computer Science Education, Course Descriptions
Ragan, Stephen W. – 1976
Two systematic ways of analyzing and planning the components of a program or project, both used extensively by industry and government, are discussed in this paper. The methods are Program Evaluation and Review Technique (PERT) Networks and Critical Path Method (CPM) Arrow Diagrams. The purposes of this paper are (1) to explore the need for…
Descriptors: Critical Path Method, Diagrams, Educational Planning, Long Range Planning
COOK, DESMOND L. – 1967
THIS PAPER, PRESENTED AT THE SYMPOSIUM ON THE APPLICATION OF SYSTEMS ANALYSIS AND MANAGEMENT TECHNIQUES TO EDUCATIONAL PLANNING IN CALIFORNIA, JUNE 12-13, 1967, DISCUSSES THE USES OF SYSTEMS ANALYSIS AND MANAGEMENT TECHNIQUES IN PROGRAM PLANNING AND EVALUATION. THE DISCUSSION FOCUSES ON THE GENERAL CONCEPT OF MANAGEMENT SYSTEMS AND, WITHIN THIS…
Descriptors: Administration, Computer Oriented Programs, Critical Path Method, Data Collection
Braun, Susan; Groom, Kenneth N. – 1969
The various tasks that have to be undertaken before the construction of a new school can begin are complex. In Great Britain, the Local Government Operational Research Unit was asked by Northumberland County Council to examine how delays in the preconstruction period might be reduced. A detailed analysis was made of nine school building projects…
Descriptors: Administrative Problems, Critical Path Method, Elementary Secondary Education, Foreign Countries
Bannerman, James W. – 1976
A practicum was conducted to develop a scientific management tool that would assist students in obtaining a systems view of their college curriculum and to coordinate planning with curriculum requirements. A modification of the critical path method was employed and the result was a time-based network model of the Industrial Engineering Technology…
Descriptors: College Curriculum, Critical Path Method, Curriculum Development, Degree Requirements
McIsaac, Donald N., Jr.; and Others – 1969
Prepared specifically for the Denver Public Schools, this manual nevertheless provides some of the basic understanding required for the proper execution of educational planning based upon PERT/CPM techniques. The theory of PERT/CPM and the fundamental processes involved therein are elucidated in the first part of the manual while the operating…
Descriptors: Administration, Critical Path Method, Data Processing, Educational Administration
Case, C. Marston – 1969
The application of a PERT system to a large-scale project will increase the probability of accomplishing project objectives by providing greater visibility of (1) the project objectives, (2) the relationships among the parts of the projects, and (3) the relationships of those component parts to the project objectives. Consequently, educational…
Descriptors: Cooperative Programs, Coordination, Critical Path Method, Educational Researchers
Previous Page | Next Page ยป
Pages: 1  |  2