NotesFAQContact Us
Collection
Advanced
Search Tips
Audience
Laws, Policies, & Programs
Assessments and Surveys
What Works Clearinghouse Rating
Showing 1 to 15 of 17 results Save | Export
Peer reviewed Peer reviewed
Direct linkDirect link
Doris Catharine Cornelie Knatz Kowaltowski; Pedro Padilha Gonçalves; Benjamin Cleveland – Learning Environments Research, 2024
Education at all levels is being transformed, impacting teaching methods, materials, and the physical learning environment. Over recent years, efforts have been made to align school architecture with contemporary educational practices to create stimulating and responsive teaching and learning environments. In this context, Evidence-Based Design…
Descriptors: Architecture, Building Design, Educational Facilities Design, Educational Environment
Lisa Sandlos; Rennie Tang – Harvard Educational Review, 2024
In this essay, Lisa Sandlos and Rennie Tang investigate the potential for movement to play a more significant role in schoolyard design processes to enhance the physical literacy of middle school youth. This research responds to a need for prioritizing physical literacy for historically marginalized youth whose movement needs are often different…
Descriptors: Undergraduate Students, Grade 6, Movement Education, Motion
Abramson, Paul – School Planning & Management, 2015
This annual report examines information on school construction completed and underway during 2014 and planned to start in 2015. Among the findings of this report: (1) school districts in the United States spent more than $14 billion ($14,123,865,000) on construction projects completed during the 2014 calendar year; (2) most of the construction…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, School Districts
Taege, Jeffrey; Krauter, Krista; Lees, Jonathan – Center on Innovations in Learning, Temple University, 2015
This field report is the third in a series produced by the Center on Innovations in Learning's League of Innovators. The series describes, discusses, and analyzes policies and practices that enable personalization in education. Issues of the series will present either issue briefs or, like this one, field reports on lessons learned by…
Descriptors: Individualized Instruction, Learning Problems, Emotional Disturbances, English Language Learners
Abramson, Paul – School Planning & Management, 2014
This annual report examines information on school construction completed and underway during 2013 and planned to start in 2014. Among the findings of this report: (1) school districts in the United States spent just over $13 billion ($13,390,396,000) on construction projects completed during the 2013 calendar year; (2) school construction in 2013…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, School Districts
Abramson, Paul – School Planning & Management, 2013
The bottom line on school construction in 2012 is that total spending edged up slightly from the previous year, (to $12.9 billion from $12.2 billion), but the spending for new schools declined from $6.9 billion to $6.177 billion. The increase in overall spending was attributable to more spending for additions and a major increase in spending for…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, Surveys
Abramson, Paul – School Planning & Management, 2012
The 2012 "School Planning & Management"'s 17th Annual School Construction Report reports over the last two years although school construction had fallen from previous highs, the pipeline of projects funded before the recession was still full. And so, in 2009 total construction was a solid $16.4 billion. But the pipeline is not being…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, Surveys
Abramson, Paul – School Planning & Management, 2011
Almost 73 percent of construction in 2009 was of new school buildings. New school buildings accounted for less than 60 percent of construction spending in 2010, suggesting a shift to using less abundant construction dollars to upgrade and add to existing buildings. While overall construction fell more than $1.8 billion in 2010, spending on…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, Surveys
Ogurek, Douglas J. – School Business Affairs, 2010
At the original Hubble Middle School, neither the views (a congested Roosevelt Road and glimpses of downtown Wheaton) nor the century-old facility that offered them was very inspiring. Built at the start of the 20th century, the 250,000-square-foot building was converted from Wheaton Central High School to Hubble Middle School in the early 1980s.…
Descriptors: Educational Facilities Improvement, Educational Facilities Design, Educational Facilities Planning, Energy Conservation
Abramson, Paul – School Planning & Management, 2010
School construction in 2009 fell 16 percent from one year ago, to just $16.4 billion, the lowest annual total for school construction since 1998. Indications are that it will fall further this year. "School Planning & Management" received reports on school construction completed and underway during 2009 and planned to start in 2010…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, Surveys
Duke, Daniel L.; DeRoberto, Thomas; Trautvetter, Sarah – National Clearinghouse for Educational Facilities, 2009
This document reviews recent efforts to promote small schools. The rationale for small schools is discussed, drawing on recent studies linking school size and various outcomes. Arguments for large schools are considered, followed by an examination of four ways to reduce the negative effects of school size--build smaller schools, utilize satellite…
Descriptors: Standardized Tests, School Size, Small Schools, Outcomes of Education
Abramson, Paul – School Planning & Management, 2009
School construction remains high, but not as high as it has been over the last eight years. Projections for the future (projects expected to be completed and/or started in 2009) show a significant decline. Capital budgets may be in place, but the economic hard times and forced cuts in many local school programs are having an effect on construction…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, Surveys
Abramson, Paul – School Planning & Management, 2008
School construction completed in 2007--including new buildings, additions to existing buildings, and major retrofit of existing buildings--totaled almost $20.8B, a signifi cant increase over the $20.1B spent on construction completed in 2006. This marks the seventh year in the last eight that annual construction exceeded $20B. During the eight…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, Surveys
Council of the Great City Schools, 2008
The Detroit Public Schools (DPS) have been battered by substantial outside forces over the last decade. The school system was taken over by the state; its elected school board was dissolved and replaced by an appointed body; its many operating systems were privatized; its citizenry were encouraged to flee to charter schools; and its resources have…
Descriptors: Urban Schools, Charter Schools, Textbooks, State Standards
Abramson, Paul – School Planning & Management, 2007
School construction completed in 2006 totaled just more than $20 billion, a drop of seven percent from the record $21.6 billion put in place in 2005. Even so, it was the sixth year in the last seven that annual construction exceeded $20 billion. During the seven years of the present century, school districts have completed construction projects…
Descriptors: Educational Facilities Planning, School Buildings, School Construction, Surveys
Previous Page | Next Page »
Pages: 1  |  2