Publication Date
In 2025 | 0 |
Since 2024 | 0 |
Since 2021 (last 5 years) | 0 |
Since 2016 (last 10 years) | 1 |
Since 2006 (last 20 years) | 4 |
Descriptor
Critical Path Method | 7 |
Models | 7 |
Scheduling | 7 |
Curriculum Development | 2 |
Foreign Countries | 2 |
Networks | 2 |
Program Administration | 2 |
Achievement Gains | 1 |
Barriers | 1 |
Building Design | 1 |
Business Administration… | 1 |
More ▼ |
Source
American Journal of Business… | 1 |
CEFP Journal | 1 |
College and University | 1 |
Journal of College Teaching &… | 1 |
Journal of Technology and… | 1 |
Author
Ballesteros-Pérez, Pablo | 1 |
Bannerman, James W. | 1 |
Camp, William | 1 |
Doyle, John Kevin | 1 |
Garza, Joe M., Jr. | 1 |
González-Cruz, Maria C. | 1 |
Hill, Duncan L. | 1 |
LIEBESKIND, MORRIS | 1 |
Larsen, Graeme D. | 1 |
Publication Type
Journal Articles | 5 |
Reports - Research | 3 |
Dissertations/Theses | 1 |
Guides - Non-Classroom | 1 |
Reports - Descriptive | 1 |
Education Level
Higher Education | 3 |
Postsecondary Education | 1 |
Audience
Administrators | 1 |
Practitioners | 1 |
Location
Canada (Toronto) | 1 |
Germany | 1 |
Texas | 1 |
Laws, Policies, & Programs
Assessments and Surveys
What Works Clearinghouse Rating
Ballesteros-Pérez, Pablo; Larsen, Graeme D.; González-Cruz, Maria C. – Journal of Technology and Science Education, 2018
Many engineering projects fail to meet their planned completion dates in real practice. This is a recurrent topic in the project management literature, with poor planning and controlling practices frequently cited among the most significant causes of delays. Unfortunately, hardly any attention has been paid to the fact that the classical…
Descriptors: Program Administration, Student Projects, Scheduling, Engineering
Hill, Duncan L. – College and University, 2010
Focusing on the current timetabling process at the University of Toronto Mississauga (UTM), I apply David Wesson's theoretical framework in order to understand (1) how increasing enrollment interacts with a decentralized timetabling process to limit the flexibility of course schedules and (2) the resultant impact on educational quality. I then…
Descriptors: Educational Quality, Leadership Styles, Scheduling, Organizational Change
Doyle, John Kevin – American Journal of Business Education, 2010
Critical Chains project management focuses on holding buffers at the project level vs. task level, and managing buffers as a project resource. A number of studies have shown that Critical Chain project management can significantly improve organizational schedule fidelity (i.e., improve the proportion of projects delivered on time) and reduce…
Descriptors: Critical Path Method, Program Administration, Manufacturing, Teaching Methods
Garza, Joe M., Jr. – Journal of College Teaching & Learning, 2008
This paper describes the process for expanding an existing ten year study abroad program between two universities, the University of Texas Pan American, Edinburg, Texas, and the Leuphana University, Lueneburg, Germany. The model for this reciprocal educational program will include a process for enrollment, suggested curricula, course scheduling,…
Descriptors: Foreign Countries, Study Abroad, International Educational Exchange, Student Exchange Programs

Camp, William – CEFP Journal, 1985
In an attempt to correct for limitations in the Program Evaluation and Review Technique-Critical Path Method (PERT-CPM), the Graphical Evaluation and Review Technique (GERT) has been developed. This management tool allows for evaluation during the facilities' development process. Two figures and two references are provided. (DCS)
Descriptors: Critical Path Method, Educational Facilities Planning, Formative Evaluation, Management Systems
LIEBESKIND, MORRIS – 1965
PROBLEMS IN THE SCHEDULING AND COMPLETION OF SCHOOL BUILDING DESIGN AND CONSTRUCTION PROJECTS ARE DISCUSSED WITH REFERENCE TO THE CRITICAL PATH METHOD OF PROGRAMING. THE DISCUSSION GIVES A BROAD OVERVIEW OF THE METHOD WITH DETAILED SUGGESTIONS FOR SCHOOL ADMINISTRATORS. SPECIFIC SUBJECT AREAS INCLUDE--(1) CPM, A NEW MANAGEMENT TOOL, (2) CPM…
Descriptors: Building Design, Computers, Critical Path Method, Information Processing
Bannerman, James W. – 1976
A practicum was conducted to develop a scientific management tool that would assist students in obtaining a systems view of their college curriculum and to coordinate planning with curriculum requirements. A modification of the critical path method was employed and the result was a time-based network model of the Industrial Engineering Technology…
Descriptors: College Curriculum, Critical Path Method, Curriculum Development, Degree Requirements