NotesFAQContact Us
Collection
Advanced
Search Tips
Showing all 3 results Save | Export
Kliment, Stephen A.; Smith, Jack W. – American School Board Journal, 1971
Describes fast-track, a method for saving time and construction costs by phased or overlapping construction--e.g., constructing such elements as the foundation before the rest of the building has been completely designed. (JF)
Descriptors: Architectural Programing, Building Systems, Construction Costs, Educational Facilities Design
Building Systems Information Clearinghouse, Menlo Park, CA. – 1971
This document attempts to provide a "state of the art" study of the application of building systems to construction with emphasis on educational facilities. Although directed primarily at the architect and the building team, this material can also be useful to those who contemplate using building systems. Building systems are considered part of a…
Descriptors: Annotated Bibliographies, Architectural Programing, Bids, Building Systems
Baas, Alan M. – 1973
Replacing the general contractor with a "construction manager" directly accountable to the owner promises greatly improved control over cost and scheduling economies. The construction manager should have special skills in construction, cost analysis, critical path method scheduling, and be familiar with the qualifications of local subcontractors.…
Descriptors: Architectural Programing, Building Systems, Construction Costs, Construction Management