NotesFAQContact Us
Collection
Advanced
Search Tips
Showing all 3 results Save | Export
Building Research, 1966
Comprehensive building systems are the result of industry's search for markets, clients' desire for shorter hours and lower costs, and the growing complexity of building technology which requires the architect to depend on industry for research and development. Certain questions are raised by this trend. Will industry dominate architecture? Can…
Descriptors: Architects, Architectural Programing, Building Design, Building Systems
Baas, Alan M. – 1973
Replacing the general contractor with a "construction manager" directly accountable to the owner promises greatly improved control over cost and scheduling economies. The construction manager should have special skills in construction, cost analysis, critical path method scheduling, and be familiar with the qualifications of local subcontractors.…
Descriptors: Architectural Programing, Building Systems, Construction Costs, Construction Management
New Jersey State Dept. of Higher Education, Trenton. – 1972
The major special feature of a planned college building is the application of Academic Building System (ABS) planning concepts to the building design and construction. The primary feature of this approach is total future flexibility of general academic space by use of movable and compatible subsystems. These subsystems appear in the form of…
Descriptors: Architectural Programing, Building Design, College Buildings, College Planning