Ragan, Stephen W. – 1976
Two systematic ways of analyzing and planning the components of a program or project, both used extensively by industry and government, are discussed in this paper. The methods are Program Evaluation and Review Technique (PERT) Networks and Critical Path Method (CPM) Arrow Diagrams. The purposes of this paper are (1) to explore the need for…
Descriptors: Critical Path Method, Diagrams, Educational Planning, Long Range Planning
Bannerman, James W. – 1976
A practicum was conducted to develop a scientific management tool that would assist students in obtaining a systems view of their college curriculum and to coordinate planning with curriculum requirements. A modification of the critical path method was employed and the result was a time-based network model of the Industrial Engineering Technology…
Descriptors: College Curriculum, Critical Path Method, Curriculum Development, Degree Requirements