NotesFAQContact Us
Collection
Advanced
Search Tips
What Works Clearinghouse Rating
Does not meet standards1
Showing 331 to 345 of 1,213 results Save | Export
Peer reviewed Peer reviewed
Speight, Jerry – School Arts, 1973
A classroom converted to an art gallery at Brescia College, Owensboro, Kentucky. (CB)
Descriptors: Art, Arts Centers, College Programs, Color
Bailey, Robert R. – School Shop, 1972
Descriptors: Construction (Process), Construction Materials, Educational Media, Industrial Arts
Peer reviewed Peer reviewed
Finn, R. H. – Educational and Psychological Measurement, 1972
Since both the means and reliabilities of the ratings were affected by the number of scale levels but not by the manner of defining scale levels, it would appear that the most critical consideration in rating scale construction is that of determining the appropriate number of rating scale levels. (Author/MB)
Descriptors: Construction (Process), Factor Structure, Rating Scales, Reliability
Christine, Emma Ruth – Wilson Library Bulletin, 1972
The author reports upon her assignment as consultant during the construction of the new library for the international school in Islamabad, West Pakistan. (SJ)
Descriptors: Construction (Process), Foreign Countries, Libraries, Library Collections
Peer reviewed Peer reviewed
Tropf, Carl F. – CEFP Journal, 1972
Describes the problems and inequities present in traditionally managed construction projects. Agrees that adopting a team management approach and using a construction manager will not only save money and shorten the time, but will provide the owner with greater control over the project. (Author)
Descriptors: Architects, Construction (Process), Construction Costs, Construction Industry
Peer reviewed Peer reviewed
Collins, George J. – CEFP Journal, 1972
Provides legal principles of which prospective owners should be aware. The author points out the particular legal problems of projects involving third party construction managers. Topics covered are (1) substantial performance, (2) interpretations of time, (3) impossibility of performance, (4) third party impairments, (5) reliance on promises, (6)…
Descriptors: Construction (Process), Construction Industry, Construction Management, Contracts
Peer reviewed Peer reviewed
Wymer, Ivor; Bonell, Ray – Education and Training, 1971
Outlines a guidance system for students in construction courses. (SB)
Descriptors: Academic Ability, Building Trades, Construction (Process), Guidance Programs
Olfson, Lewy – Sch Manage, 1970
Revision of building codes are discussed, as they relate to educational facilities. (RG)
Descriptors: Construction (Process), Construction Costs, Construction Materials, School Planning
Hales, James A.; Snyder, James F. – Man/Society/Technology, 1982
Presents narratives, charts, and diagrams showing the unique aspects of the four subsystems of human technical endeavor. These subsystems are communication, construction, manufacturing, and transportation. (For part 1 of this series, see CE 511 770.) (CT)
Descriptors: Communications, Construction (Process), Curriculum Evaluation, Industrial Arts
Peer reviewed Peer reviewed
And Others; Burket, T. J. – Information Processing and Management, 1979
Discusses the text retrieval system, EUREKA, and its techniques for helping the unsophisticated user through the search for and understanding of information based on the vocabulary file concept. Methods for easy construction and maintenance of a suitable data base organization through the EURUP system are described. (RAA)
Descriptors: Construction (Process), Databases, Information Retrieval, Maintenance
Peer reviewed Peer reviewed
Lane, George – School Arts, 1978
Complete instructions, materials needed, and approximate costs are given for constructing a kiln for firing Raku ceramics. (SJL)
Descriptors: Art Activities, Art Products, Ceramics, Construction (Process)
Hanson, Peter G.; And Others – Research Quarterly, 1976
This paper describes the design and use of a simple portable electronic metronome using standard parts that may be built locally for low costs. (MB)
Descriptors: Athletics, Cardiovascular System, Construction (Process), Measurement Instruments
Peer reviewed Peer reviewed
Park, Moonseo; Chan, Swee Lean; Ingawale-Verma, Yashada – Journal of Construction Education, 2003
Factors in successful implementation of simulation in construction education are as follows: (1) considering human factors and feedback effects; (2) focusing on tradeoffs between with managerial decisions and construction policies; and (3) developing a standalone tool that runs on any platform. Case studies demonstrated the effectiveness of these…
Descriptors: Computer Simulation, Construction (Process), Feedback, Higher Education
DeLiberato, Jerry – School Business Affairs, 2003
Provides seven tips for selecting glass contractors for large-scale construction projects at educational institutions. (PKP)
Descriptors: College Buildings, Colleges, Construction (Process), Elementary Secondary Education
Peer reviewed Peer reviewed
Technology Teacher, 1990
Presents learning activities for occupations in construction technology, designing a beam, and simple machines. (JOW)
Descriptors: Construction (Process), Construction Industry, Learning Activities, Mechanics (Physics)
Pages: 1  |  ...  |  19  |  20  |  21  |  22  |  23  |  24  |  25  |  26  |  27  |  ...  |  81